Installation of 24 photovoltaic panels
Text
The installation of the photovoltaic panels was carried out very quickly thanks to the fixing system developed by ARaymond. In fact, one day of intervention was necessary to install and connect 24 photovoltaic panels. The integration exercise was very successful and allows us to envisage a significant reduction in installation costs and the duration of return on investment.