The demonstrator

Montalieu
Text

The building selected for the demonstration of the CONIPHER concept houses the offices, the laboratory and the control room of the Vicat Montalieu-Vercieu cement plant. It is a building constructed in the 1970s, in prefabricated concrete. This building has a complex molding with 3 facade levels and large openings. In addition to its 24-hour occupancy, on a site with high security requirements, the building presents an ideal renovation exercise for the modularity of the CONIPHER system. The renovation is managed by the WS-A agency.

The Vicat cement plant in Montalieu-Vercieu

The Vicat cement plant in Montalieu-Vercieu, located in France, was built in 1922 and has benefited from significant investments to increase its production capacity, optimize its cost price, reduce emissions and improve safety. The cement plant has also implemented several innovative projects to reduce its carbon footprint, notably the Meteor project which aims to increase the proportion of alternative fuels to fossil fuels. By 2030, the objective is to use 100% alternative fuels.

Cement factory

  1. Ciment Vicat Route des Usines, BP 14 38390 Montalieu-Vercieu Tel : +33474335833

Diagnosis and 3D laser plot of the building

WS-A et ATFF

ATFF
Text

Laser surveying is a 3D scanning technique that captures the dimensions, shapes and contours of each element of a building in the form of a very dense point cloud. In particular, it makes it possible to produce compliant 2D plans, necessary for the layout of the building and the production of prefabricated elements with the right dimensions.

Building layout

WS-A

Layout
Text

Layout refers to planning the arrangement of construction elements in order to optimize their use, minimize material loss and ensure aesthetic harmony. The layout carried out on the demonstrator allowed the treatment of 50% of a complex facade with standard sized panels (1200x600mm) whose production is rationalized, thus allowing optimization of the cost of the renovation.

Preparation of the facade and its interfaces

WS-A + Vercors Façade + Avenir Métal + Varvier TP + Tissot Etanchéité

Préparation
Text

The first phase of the renovation concerns the northeast wing of the building, housing the control room and the laboratory. It has 200m2 of facade to be treated with 300 CONIPHER panels. The preparation of the facade made it possible to remove the organic coating, treat the base (gutter) and the parapet, and manage the various bare areas by installing metal profiles. At the same time, the insulation and waterproofing of the roof was carried out in order to complete the next insulation of the facades.

Installation of CONIPHER panels

Vercors Façade

Installation
Text

The installation of the panels was carried out in July 2023. The chrono-analysis gives an installation rate of 20m2/d, with optimization easily accessible through training of installers, adaptation of lifting tools and means of drilling. 

Photovoltaic panels installation

ECHOME Energies

PV
Text

The installation of the photovoltaic panels was carried out very quickly thanks to the fixing system developed by ARaymond. In fact, one day of intervention was necessary to install and connect 24 photovoltaic panels.